371 Views
Climate change – and the more frequent and intense heat waves it brings – is putting greater strain on our electric grid. PNM faces an added challenge during 2022’s peak-demand summer season because the pandemic and subsequent supply-chain issues have slowed construction of resources to replace the coal-fired San Juan Generating Station, which is set to retire in June.